Culvert Pipe Install, Fill Dirt, Circle Driveway, and Cabbage Grove Rocks
- ssworxfl
- Aug 11
- 1 min read
Southern Site Worx was contracted by the client for multiple services. Initially, we installed 100 feet of 15-inch HDPE culvert pipe. This pipe was placed in the ditch in front of the house and covered with fill dirt, extending the yard and allowing us to construct a circular driveway. After installing the culvert pipe, we removed the grass where the circular driveway was planned. We managed to save most of the removed grass and relocated it to the newly installed culvert pipe area. Once the grass was removed from the driveway site, we brought in 40 tons of #57 Cabbage Grove Rock. The rock was laid in the newly cut circular driveway, connecting it to the existing driveway and then to the street. This project took place in the White City area of Gulf County, Florida.